What is needed for a Milestone C decision review?
For Milestone C approval, the following general criteria apply: An approved Acquisition Strategy (AS). Demonstration that the production design is stable and meets stated and derived requirements based on acceptable performance in developmental test. An operational assessment.
What Is a Milestone C decision?
Milestone C (MS C) is a Milestone Decision Authority (MDA) led review at the end of the Engineering and Manufacturing Development (EMD) Phase of the Defense Acquisition Process. Its purpose is to make a recommendation or seek approval to enter the Production and Deployment (PD) Phase.
In what document will you find the exit criteria as determined by the milestone decision authority MDA for any phase?
The MDA approves and publishes the exit criteria in the Acquisition Decision Memorandum (ADM). The Defense Acquisition Executive Summary (DAES) Report updates the status of exit criteria completion as the program progresses.
Which one of the following test and evaluation activities takes place at milestone A?
The Test and Evaluation Strategy (TES) is an early Test and Evaluation (T&E) planning document that is required at Milestone A and describes the T&E activities starting with Technology Development and continuing through System Development and Demonstration into Production and Deployment.
What is the MDA acquisition?
Acquisition Process The Milestone Decision Authority (MDA) is the overall executive sponsor responsible for any Major Defense Acquisition Program (MDAP). The MDA formally initiates each increment of an evolutionary acquisition program as required by DoD Instruction 5000.02 “Operation of the Defense Acquisition System”.
What is the agreement between the milestone decision authority and Program Manager?
The APB is the agreement between the MDA and the Program Manager and his or her acquisition chain of command that will be used for tracking and reporting for the life of the program or program increment. The APB will include the affordability caps for unit production and sustainment costs.
What is the name of the document that is signed by the milestone decision authority?
DoD Directive 5000.01 “Defense Acquisition System”
What is the agreement between the milestone decision authority MDA and Program Manager?
Which technical review is required for a successful Milestone B prior to the engineering and manufacturing development phase?
System Requirements Review (SRR) The SRR is used during the Milestone-B review to determine if a program can process into the Engineering, Manufacturing, and Development (EMD) Phase.
What are the exit criteria for a milestone B program?
The Exit Criteria are determined by the MDA and the Acquisition Category (ACAT) level . A few of the common requirements are: The goal of Milestone B (MS B) is to determine if a program has met all its exit requirements of the Technology Maturation & Risk Reduction (TD) Phase to proceed into the Engineering & Manufacturing Development (EMD) Phase .
What are the requirements for Milestone C (MS C)?
A few of the common requirements are: The goal of Milestone C (MS C) is to determine if a program has met all its Exit Criteria of the EMD Phase to proceed into the Production and Deployment (PD) Phase . The exit requirements are determined by the MDA and the ACAT level.
How should entrance and exit criteria be defined and implemented?
Specific entrance and exit criteria should be defined for each process phase The criteria can be qualitative or quantitative Failure requires corrective action to be implemented The criteria should be reviewed for an update if changes in the requirements occur Ensure exit and entrance criteria are written down
What are the exit requirements for the EMD phase?
The exit requirements are determined by the MDA and the ACAT level. A few of the common requirements are: The goal of Milestone C (MS C) is to determine if a program has met all its Exit Criteria of the EMD Phase to proceed into the Production and Deployment (PD) Phase .