What is the purpose of Navfac P-307?
NAVFAC P-307 provides the minimum training and competency requirements for personnel involved in the maintenance, inspection, testing, certification, repair, alteration, operation/rigging of weight handling equipment (WHE) owned by the Navy.
Who is responsible to include the requirements of Navfac P-307 Paragraph 11.1 in contracts?
Contracting Officer
Contracting Officer Responsibilities The contracting officer shall include the minimum requirements of NAVFAC P-307 paragraph 11.1 in contracts, ensure compliance with contract requirements, provide oversight of contractor crane and rigging operations, and provide oversight of contractor accident investigations and …
What are the 5 principal parts of Category 1 and Category 4 cranes?
Category 1 and 4 Crane Components The principal parts of most Category 1 and 4 cranes are: the boom, machinery house, roller path or rotate bearing, supporting structure, and travel system.
Which publication provides weight handling equipment training requirements and inspections?
The proper licensing, operation, maintenance, and safe handling of weight-handling equipment is regulated by NPSINST 5100.11 (series), “Management of Weight Handling Equipment” with responsibilities delineated therein.
When giving the signal the Signalperson must watch the crane for two blocking?
When giving the? signal, the signalperson must watch the crane for two-blocking. Raising the boom decreases the load radius, which increases the load capacity of the crane.
Which of the following markings are required on lashing?
Lashing Lashing must be marked to identify it to the spool or reel from which it came. The rated load must be marked on each piece as well as the re- inspection due date.
What is plugging on a crane?
Plugging: A control function which accomplishes braking by reversing the motor line voltage polarity or phase sequence. Protective Panel: An assembly containing overload and undervoltage protection for all crane motions.
What is two blocking a crane?
Two blocking means a condition in which a component that is uppermost on the hoist line such as the load block, hook block, overhaul ball, or similar component, comes in contact with the boom tip, fixed upper block or similar component.
Which Navy publication provides requirements for physical security of conventional A&E?
OPNAVINST 5530.13C, DEPARTMENT OF THE NAVY PHYSICAL SECURITY INSTRUCTION FOR SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (AA&E); CHAPTER 1, 2, 4, 5, 6, 9.
What publication provides A&E handling Qual Cert responsibilities and procedures for Navy personnel?
(N41) NAVY PERSONNEL CONVENTIONAL AMMUNITION AND EXPLOSIVES HANDLING QUALIFICATION AND CERTIFICATION PROGRAM.
What does dog the load mean?
Magnet is Disconnected! Dog Everything: Clasp hands in front of the body. Means PAUSE. This signal can be used on potentially risky occasions such as when it has started raining, when the load doesn’t fit the space for which it was planned, or when a bystander gets too close to the action.
Who can give a stop or emergency stop signal?
Anyone who becomes aware of a safety problem must alert the operator or signal person by giving the stop or emergency stop signal. (Note: ยง 1926.1417(y) requires the operator to obey a stop or emergency stop signal).