Which UST system components or equipment require inspections annually?
TESTING REQUIREMENTS FOR SPILL PREVENTION EQUIPMENT, OVERFILL PROTECTION EQUIPMENT, CONTAINMENT SUMPS, AND RELEASE DETECTION – Owners/operators are required to test spill prevention equipment, containment sumps used as secondary containment for piping and overfill protection equipment every three years, and release …
What is the fee per tank in Texas?
Fee Rates
Capacity of Receiving Tank | Fee |
---|---|
<2,500 gallons | $1.70 |
≥2,500 gallons, but <5,000 gallons | $3.45 |
≥5,000 gallons, but <8,000 gallons | $5.45 |
≥8,000 gallons, but <10,000 gallons | $6.95 |
What is a healthy ozone level?
Good (0-50) No health impacts are expected when air quality is in this range. Moderate (51-100) Unusually sensitive people should consider limiting prolonged outdoor exertion.
What is a good ozone level?
0-50
Good (0-50) It’s a great day to be active outside. Moderate (51-100) Some people who may be un- usually sensitive to ozone. Unusually sensitive people: Consider reducing prolonged or heavy outdoor exertion. Watch for symptoms such as coughing or shortness of breath.
Where does EPA’s 2015 MSGP apply?
EPA’s 2015 MSGP applied in areas of the country where EPA is the NPDES permitting authority and has made the permit available for coverage. These areas include: Other designated activities in specific states (e.g., oil and gas activities in Texas and Oklahoma).
How do I notify EPA of stormwater discharge from industrial activity?
Prior to the discharge of stormwater associated with industrial activity, provide EPA 30-days advance notice of their operator status and their intention to operate in accordance with the 2015 MSGP by submitting an ” Intent to Operate” (ITO) form through the NPDES eReporting Tool (NeT) for MSGP, to allow EPA time to review the notice;
What happens to existing operators when EPA issues a new MSGP?
Once EPA issues the new MSGP, existing operators will have 90 days from the effective date of the new MSGP to submit a new NOI using NeT-MSGP in order to obtain coverage under the new MSGP. EPA will notify operators when the Agency issues the new MSGP and provide support and resources to understand any new requirements in the permit.
When did EPA publish the 2015 underground storage tank regulation?
In the July 15, 2015 Federal Register (PDF) (119 pp, 1.5 MB), EPA published the 2015 underground storage tank regulation and the 2015 state program approval regulation. The revisions strengthen the 1988 federal underground storage tank (UST) regulations by increasing emphasis on properly operating and maintaining UST equipment.